Achievements
COMPLETE PROJECT SUMMARY
THE COMPANY HAS SUCCESSFULLY COMPLETED AND HANDED OVER THE FOLLOWING PROJECTS:
· SUPPLY OF SPARE PARTS & ACCESSORIES TO DIFFERENT POWER PLANTS
Load Gera Box, Accessory Gear Box & Spare parts Manufacturer by FLENDER GRAFFENSTADEN, FRANCE |
|
Ø Supply of Spare Parts for Accessory Gear Box of Mymensingh Power Station |
2011 |
Ø Supply of Spare Parts for Accessory Gear Box of Mymensingh Power Station |
2012 |
Ø Supply of Lube Oil Pump for Unit No 8 & 9 of Shahjibazar Power Station |
2013 |
Ø Supply of Goods for Procurement of Load Gear Box bearing & Related Parts for Mymensingh Power Station |
2013 |
Ø Procurement of Parts for Accessory Gear Box for GE Frame 6B Gas Turbine of Mymensingh Power Station |
2013 |
Ø Supply of AGB (Accessory Gear Box) Complete Set for Barisal Gas Turbine Power Station, BPDB, Barisal. |
2015 |
Ø Supply of Load Gear Bearing of GT Unit 1( Each 20 MW,Type PG-5341, Model-5001) for Bheramara Power Station |
2015 |
Ø Procurement of Spares for Accessory Gear Box for GT Unit 8& 9 of Shahjibazar Power Station |
2015 |
Ø Procurement of Spares for ACC Gear Box for Mymensingh Power Station |
2016 |
Ø Supply of Accessory Gear Box of Rangpur 20 MW GT Power Station, BPDB, Rangpur, Bangladesh. |
2017 |
Ø Supply of Accessory Gear Box for 100 GT Unit’s of Baghabari Power Station, BPDB, Sirajgonj, Bangladesh. |
2017 |
Ø Supply of Load Gear Box for GT Unit No.1 of Bheramara Power Station, BPDB, Kushtia, Bangladesh. |
2017 |
Ø Supply of Load Gear Box for Saidpur 20 MW Gas Turbine Power Station, BPDB, Nilphamari, Bangladesh. |
2018 |
Actuators Manufacturer by SIPOS AKTORIK GmbH |
|
Ø Supply of Spare Parts for Motor Operated Valve (MOV), SIPOS for Mymensingh Power Station |
2011 |
Ø Procurement of Spare Parts for Motor Operated Valve of STG & HRSG for Mymensingh Power Station |
2012 |
Ø Supply Instrumentation and Control Spare Parts for Phase III of Mymensingh Power Station |
2013 |
Ø Supply of Sipos Power Control PCB for Mymensingh Power Station, Mymensingh |
2013 |
Ø Procurement of Spares for Sipos Motor Operated Valve for Mymensingh Power Station |
2015 |
Ø Supply of SIPOS Electric Valve Actuator Complete Set & Spares for Barapukuria Coal Fired Thermal Power Station, BPDB, Dinajpur. |
2016 |
OSAKA JACK CO., LTD. |
|
Ø Supply of Spare Parts, HSD Forwarding System (Lot-2: Jacks Tools & Instrument) of Saidpur 20 MW GT Power Station. |
2015 |
TMS TURBOMASCHINENSERVICE GmbH |
|
Ø Procurement of MI Consumables for Steam Turbine of Mymensingh Power Station |
2017 |
SOR CONTROLS GROUP, LTD, USA |
|
Ø Supply of Transmitter, Switches etc, ( Lot-1: Switches) for I & C Division of Barapukuria Coal Fired Thermal Power Station, BPDB, Dinajpur, Bangladesh. |
2015 |
SUD ROBINETTERIE INDUSTRIE (SRI) |
|
Ø Procurement of Spare for Ball Valve for Gas Skid of Mymensingh Power Station. |
2017 |
HARTMANN CONTROLS INC. |
|
Ø Procurement of Hydraulic Pump for Baghabari Power Station. |
2018 |
Ø Procurement of Hydraulic Pump for Fenchugang CCPP, BPDB. |
2017 |
KELVION INDIA PVT. LTD |
|
Ø Supply of HT & LT cooler plate Set and additional Gasket for Santahar 50MW Peaking Power Plant, BPDB, Santahar, Bogra, Bangladesh. |
2017 |
Ø Supply of Heat Exchanger Plate set (HT/LT Cooler plate) and Additional HT & LT Gasket for Katakhali 50 MW Peaking Power Plant, BPDB, Rajshahi |
2017 |
SHANGHAI BLOWER WORKS CO., LTD |
|
Ø Procurement of Impeller with rotor & Inlet Cone of Induced Draft Fan for Barapukuria Coal Fired Thermal Power Station, |
2018 |
OTHER MANUFACTURERS |
|
Ø Supply of Inverter (Manufactured by AEES, France ) for Mymensingh Power Station. |
2010 |
Ø Supply of Gas Turbine Air Intake Filter (T-60) (Manufactured by Braden Manufacturing LLC.) for Mymensingh Power Station. |
2010 |
Ø Supply of Inverters and Heater for Bearing (Manufactured by AEES, France) for Mymensingh Power Station. |
2011 |
Ø Supply of Diverter Control Panel Air Conditioner (Manufactured by Rittal India.) for Mymensingh Power Station. |
2011 |
Ø Supply Gas Turbine Air Intake T-90 (Manufactured by Braden Manufacturing LLC.) Pocket Type Filter for Mymensingh Power Station. |
2011 |
Ø Supply of Goods (Spares for Filter Press Pump) (Manufactured by Josef Emmerich Pumpenfabrik GmbH.) for Mymensingh Power Station, Mymensingh. |
2015 |
Ø Supply of Fuel Filter & Lube Oil Filter (Manufactured by Fluitek Corporation USA & Arrow Pneumatics USA.) for GT-1 (of Barisal Gas Turbine Power Station, BPDB, Barisal. |
2016 |
Ø Supply of Spares for Measuring Instruments for Siddhirganj 210 MW Thermal Power Station, BPDB, Narayanganj, Bangladesh. |
2018 |
Ø Supply & Installation of Plant lighting of Rural Power Company Limited, at 210 MW Mymensingh Power Station , Phase III |
2006 |
· RenderED Services
Ø Intermediate Inspection work of Steam Turbine Generator set (STG) at Myemsnsingh Power station (As associated partner of Turbomaschinenservice GmbH.) |
2014 |
Ø Major Inspection & Overhauling works of Steam Turbine Generator set (STG) at Myemsnsingh Power station (As associated partner of Turbomaschinenservice GmbH.) |
2017 |
Ø ERECTION & INSTRUMENTATION WORK OF BALANCE OF PLANT (BOP) OF RURAL POWER CO. LTD. AT 210 MW POWER STATIOMYMENSINGH (AS A SUB-CONTRACTOR OF SIEMENS, AG) |
2006 |
Ø ERECTION & INSTRUMENTATION OF BOILERS OF RURAL POWER CO. LTD. AT 210 MW POWER STATION MYMENSINGH PHASE-111 (AS A SUB-CONTRACTOR OF SIEMENS, AG) |
2006 |
Ø MECHANICAL INSTALLATION WORK OF RURAL POWER COMPANY LTD. AT 140 MW POWER STATION, MYMENSINGH-II ( AS A SUB-CONTRACTOR OF MELEC ENGINEERING CO. LTD, KOREA ) |
2000 |
Ø ERECTION AND INSTALLATION OF EQUIPMENT WORK OF RURAL POWER COMPANY LTD. AT 140 MW POWER STATION, MYMENSINGH-II ( AS A SUB-CONTRACTOR OF MELEC ENGINEERING CO. LTD, KOREA ) |
2000 |
· Sub-Station & Line Work
Ø DESIGN, SUPPLY & INSTALL 132/33 KV SUB- STATION OF PGCB AT BRAHMANBARIA. (AS A SUB-CONTRACTOR OF CHINA NATIONAL ELECTRIC WIRE & CABLE IMP/EXP .CORPORATION, CHINA) |
2011 |
Ø EXTENSION OF EXISTING 132 KV SUBSTATION OF PGCB AT JHENIDAH ( AS A SUB-CONTRACTOR OF CHINA NATIONAL ELECTRIC WIRE & CABLE EXP/ IMP IMP/EXP. CORPORATION, CHINA) |
2010 |
Ø EXTENTION OF 132 KV SUB-STATION PHASE-II OF RPC AT 140 POWER STATION, MYMENSINGH (AS A SUB-CONTRACTOR OF MELEC ENGINEERING CO. LTD, KOREA ) |
2000 |
Ø 132 KV SUB-STATION OF RPC AT 70 MW POWER STATION, MYMENSINGH. (AS A SUB-CONTRACTOR OF MITSUE ENGINEERING & SHIPBUILDING CO.LTD.JAPAN) |
1999 |
Ø 132 KV TRANSMISSION LINE OF PDB AT NATORE-RAJSHAHI SECTION (AS A SUB-CONTRACTOR OF HITACHI CABLES LLTD. JAPAN) |
1987 |
Ø 132/33 KV SUB-STATION PDB AT KABIRPUR, DHAKA` |
1984 |
Ø CROSSING OF 132 KV TRANSMISSION LINE OF PDB AT TONGI, DHAKA. |
1983 |
Ø 132 KV SUB-STATION (INCLUDING CONTROL ROOM BUILDING) OF PDB AT ISHURDI, PABNA (AS A SUB-CONTRACTOR OF KANEMATSU GOSHO LTD. JAPAN) |
1982 |
Ø 132/33 KV SUB-STATION OF PDB AT 60 MW POWER STATION SIKALBAHA, CHITTAGONG |
1982 |
Ø 132/33 KV SUB-STATION OF PDB AT BARISHAL |
1981 |
Ø 132/33 KV SUB-STATION OF PDB AT SAIDPUR,RANGPUR |
1976 |
Ø 132/33 KV SUB-STATION OF PDB AT KISHORGONJ |
1976 |
Ø 132/33 KV SUB-STATION OF PDB AT MYMENSINGH |
1974 |
· 33/11 KV SUB-STATION OF BREB AT: |
|
Ø EPZ-I, SAVAR, DHAKA |
2005 |
Ø PHULPUR, MYMENSINGH |
2001 |
Ø SUNAMGONJ |
2000 |
Ø TARABO, NARAYANGONJ |
1999 |
Ø HATHAZARI,CHITTAGONG |
1998 |
Ø RAMGOTI,LAXIMPUR. |
1997 |
Ø EPZ,SAVAR. |
1997 |
Ø BHALUKA, MYMENSINGH. |
1995 |
Ø RAKUDIA,BARISHAL |
1995 |
Ø KAMLAKANDA, NETRAKONA. |
1994 |
Ø BIRAMPUR, DINAJPUR. |
1994 |
Ø NETRAKONA. |
1993 |
Ø BAUFAL, PATUAKHALI. |
1993 |
Ø AMTALI, BARGUNA. |
1993 |
Ø BETAGI, BARGUNA. |
1992 |
Ø GOURANADI, BARISHAL. |
1985 |
Ø MUKTAGACHA,MYMENSINGH |
1983 |
Ø KASHIMPUR, DHAKA |
1983 |
Ø CHANDPUR, COMILLA. |
1981 |
Ø JESSORE |
1981 |
Ø DHAMRAI |
1980 |
Ø KALIAKOIRE ,DHAKA |
1980 |
· MAJOR CIVIL WORKS |
|
Ø CIVIL INCLUDING ROAD & PAVEMENT WORK OF 210 MW POWER STATION, MYMENSINGH, PHASE III. Ø ( AS A SUB-CONTRACTOR OF SIEMENS, AG) |
2006 |
Ø CONSTRUCTION OF BY-PASS ROAD OVER THE RIVER BRAHMMAPUTRA FOR TRANSPORTATION OF HEAVY EQUIPMENTGENERATOR OF RPCL AT 140 MW POWER STATION, PHASE II AT MYMENSINGH ( AS A SUB-CONTRACTOR OFGE ENERGY PRODUCTS, FRANCE) |
2006 |
Ø Rehabilitation work of Embankment slope work of 210 MW POWER STATION, MYMENSINGH, PHASE III under RPCL. ( AS A SUB-CONTRACTOR OF SIEMENS, AG) |
2006 |
Ø CONSTRUCTION OF THANA HEALTH COMPLEX OF CMMU DHUBAURA, MYMENSINGH. |
1997 |
Ø CONSTRUCTION OF OFFICE BUILDING OF REB AT MANIKGONJ |
1994 |
Ø CONSTRUCTION OF CONTROL ROOM BUILDING OF PDB AT ISHURDI, PABNA. (AS A SUB-CONTRACTOR OF KANEMATSU GOSHO LTD, JAPAN) |
1982 |
Ø CONSTRUCTION OF ‘F’ TYPE BUILDING OF PDB, SAIDPUR, RANGPUR. |
1978 |
Ø CONSTRUCTION OF WORKSHOP AND STORAGE BUILDING, 70 MW GT POWER STATION OF RPC, AT MYMENSINGH. |
1998 |
Ø CONSTRUCTION OF RESIDENTIAL BUILDING OF PDB AT ISHURDI, PABNA |
1982 |
Ø CONSTRUCTION OF C,D & E TYPE BUILDING OF REB AT TANGAIL |
1980 |
Ø CONSTRUCTION OF OFFICE BUILDING C & E TYPE BUILDING OF REB, AT CHATMOHOR, PABNA |
1983 |
Ø CONSTRUCTION OF OFFICE BUILDING OF REB AT THAKURGAON. |
1987 |
Ø CONSTRUCTION OF OPEN YEARD SHED OF REB AT JAMALPUR. |
1996 |
Ø CONSTRUCTION OF WARE HOUSE BUILDING OF REB AT MADARIPUR |
1985 |
Ø CONSTRUCTION OF ‘F’ TYPE BUILDING OF REB AT MADARIPUR |
1985 |
Ø CONSTRUCTION OF ‘F’ TYPE BUILDING OF REB AT NARSHINGDI |
1991 |
Ø CONSTRUCTION OF OFFICE BUILDING OF REB AT MARJAL, NARSHIGDI |
1991 |
Ø CONSTRUCTION OF ‘F’ TYPE BUILDING OF REB AT MARJAL, NARSHIGDI |
1989 |
Ø CONSTRUCTION OF WARE HOUSE BUILDING OF REB AT MARJAL, NARSHIGDI |
1989 |
Ø CONSTRUCTION OF WARE HOUSE BUILDING OF REB AT NETRAKONA |
1994 |
Ø CONSTRUCTION OF DEEP TUBEWEL & RESERVER OF REB AT NETRAKONA |
1995 |
Ø CONSTRUCTION OF RAMGOPALPUR R & H–SHAMGONJ RAOD (LGED) UNDER GOURIPUR UPAZILA,MYMENSINGH |
2008 |
Ø CONSTRUCTION OF GOURIPUR TO BHUTIARKONA RAOD (LGED) UNDER GOURIPUR UPAZILA, MYMENSINGH |
2008 |